Project Requirements Analysis
Basalt is a kind of igneous rock with high hardness, which is widely used in the infrastructure construction of buildings, roads, bridges, tunnels and other projects. Due to its high hardness, the crushing process is relatively complicated, so efficient and durable crushing equipment and reasonable production processes are required to ensure high yield and high efficiency.
The main goal of this production line is to provide high-quality aggregates for construction and road projects in Zhengzhou, Henan, to meet the needs of concrete mixing plants and pavement bases. The design goal is to process 600-700 tons of basalt per hour, and the final product needs to meet different specifications of sand and gravel aggregates (including 0-5mm, 5-10mm, 10-20mm, 20-40mm, 40-80mm).
Equipment Configuration List
Equipment Name | Model | Quantity | Main Function |
---|---|---|---|
Jaw Crusher | PEW Series | 1 | Primary crushing, breaks large basalt into less than 200mm |
Impact Crusher | PFW Series | 1 | Secondary crushing, breaks material to 20-40mm |
Cone Crusher | HPT Series | 1 | Tertiary crushing, refines material to 10-20mm |
Cone Crusher | HST Series | 1 | Fine particle size crushing, further controls the finished product particle size |
Circular Vibrating Screen | YK Series | 2 | Multi-layer screening, separates sand and gravel aggregates of different particle sizes |
Bag Filter | Single Machine | 1 | Dust collection, ensures environmental protection |
Belt Conveyor | Multiple | Several | Material conveying, ensures continuity |
Vibrating Feeder | GZD Series | 1 | Uniform feeding, prevents material accumulation |
PLC Control System | Customized | 1 | Automation control and remote monitoring |
Project Features and Advantages
Efficient crushing: The four-stage crushing system using PEW series jaw crusher, PFW series impact crusher, HPT series cone crusher and HST series cone crusher ensures efficient crushing and precise particle size control of basalt.
Precise screening: YK series circular vibrating screen accurately classifies materials through multi-layer screens to ensure that the finished aggregate meets different specifications.
Environmental design: Bag dust collector efficiently collects dust to ensure that the production line meets environmental standards and reduces dust emissions.
Automation control: PLC automation control system and remote monitoring system realize intelligent management of production lines, reduce labor costs, and improve production efficiency and equipment reliability.
Project budget and implementation time
Budget: The total budget for equipment procurement, installation and commissioning will be calculated in detail based on equipment selection, production environment and project scale.
Implementation time: It is estimated that the project will take 4-5 months from equipment procurement to full commissioning, depending on the equipment delivery cycle and on-site installation conditions.